8 Elm Condos

By stealth

8 Elm is a new mixed-use high-rise condominium building designed by IBI Group for Reserve Properties and Capital Developments. This project has proposed a 68-storey with a maximum of 218.2 meters to the top of the mechanical penthouse and a total of 892 sq. m. for retail in addition to 825 units including studios, one-, … Continued

Olive Residences

By stealth

Located in the rapidly developing North York Centre district, home to endless opportunities for dining and entertainment, Olive Residences is a 29-storey mixed-use condominium that is centrally located, being just steps away from Finch subway station and other major transit links at Yonge and Finch, and a short drive from Highway 401. Designed by Arcadis … Continued

Galleria On the Park – Block 5

By stealth

Designed by U31 Inc., Galleria Block 5 will be an entranceway to a retail and urban walkway through the Galleria development. The second development phase of Galleria on the Park will consist of 5 levels of underground parking that will be later joined by Block 1 and 3’s development, a 29-storey residential tower, 55 000 … Continued

Galleria on the Park – Block 2

By stealth

Part of the sprawling Galleria on the Park complex at Dufferin and Dupont, Block 2 is a 29-storey condo tower with 608 units. Galleria on the Park aims to transform the surrounding area with housing, retail and office space, as well as a brand new state-of-the-art 95,000 sq ft community centre. Block 2 will overlook … Continued

260 High Park Loft & Condos

By stealth

Located just a few blocks north of High Park, 260 High Park will be a four-storey condo building on the grounds of the former High Park-Alhambra United Church, a beautiful century-old place of worship which will be preserved and incorporated as part of the new development. Designed by Turner Fleischer Architects for Medallion Capital, CCM … Continued

Pearl Street Energy Center

By stealth

CCM has been contracted to undergo pre-construction, construction and post-construction work for Enwave’s Pearl Street Energy Centre. The renewal of and addition to existing facilities will enable Enwave to provide low-carbon heat (Enwave ‘Green Heat’) via electrification to Toronto’s world-renowned district energy grid. Once built and fully utilized, the facility will reduce emissions in Toronto … Continued

Rio Can Hall

By stealth

RioCan Hall is a mixed-use development located at 126 John Street, between Richmond Street West and John Street in Toronto in the heart of Toronto’s Entertainment and Theatre District, with quick access to St. Andrew Subway Station, Roy Thompson Hall, and Princess of Wales Theatre. Designed by Hariri Pontarini Architects for RioCan, the project proposes … Continued

310 Front West

By stealth

In development with H&R REIT and being designed by Hariri Pontarini Architects, the 310 Front St redevelopment will bring a new 69 -storey mixed use tower to the downtown core of Toronto. CCM is proud to be helping H&R REIT with the pre-planning of the demolition and new construction of the project.

1875 Steeles Avenue West

By stealth

Designed by BDP Quadrangle, 1875 Steeles Ave West proposes to redevelop a site with an existing rental apartment building dating back to 1973. The site is located on the south side of Steeles, east of Dufferin Street and west of the West Don River ravine parklands. The project includes three new residential towers (37, 31 … Continued

Craft Residences

By stealth

The 3200 Dundas West is a project located on the north side of Dundas Street West between St. John’s Place and Gilmour Avenue by Gairloch Developments. The proposed development was designed by BDP Quadrangle and includes a mid-rise 8-storey residential building with a total of 89 units divided in 1-, 2- and 3-bedroom units, and … Continued

Clark Construction Management